Summer 2019
Eni Headquarter _ Maputo _ Mozambique
CBI Europe - official supplier for the new ENI Mozambique headquarters - set up the entire supply in just one week.
This feat has been made possible thanks to the availability in stock of material present at our warehouses and to the productive strength of the Raised Access Floors division of over 1 million square meters each year.
Just a week!
Eni has been present in Mozambique since 2006, with the acquisition of a stake in the Area 4, located offshore in the Rovuma basin, in the northern part of the country. From 2011 to 2014, Eni discovered supergiant natural gas resources in the Rovuma basin, in Coral, Mamba and Agulha fields, holding estimated 2,400 billion cubic meters of gas in place.
product installed: raised access floors
CBI28S Semi steel encapsulated panels 600x600x28 mm, fire resistance 60 minutes.
Structure made with adjustable pedestals type CBI 06 ø16, 120/200 mm (21.000 pcs)
and clip on stringers type T 536/S 25x20 mm (32.500 pcs)
surface: 6.000 mq